Prefabricated student dormitories

Hero image

Thanks to the use of prefabrication technology, the construction process is significantly accelerated, allowing for rapid adaptation to the dynamically changing needs of universities.
Prefabrication involves the preliminary production of modules in a factory, which not only shortens construction time but also minimizes the impact of construction work on the ongoing operations of the campus.

Features of Moduł System prefabricated dormitories and student housing

  • Ability to quickly adapt housing infrastructure to changing needs.

  • Diverse configurations of modules, from single units to multi-building complexes.

  • Use of KVH wood and CLT panels in timber frame technology, ensuring durability and safety of the buildings.

  • Application of high-quality insulation that minimizes sound transmission between units.

  • Adaptation for individuals with mobility limitations.

  • Utilization of environmentally friendly materials and energy efficiency.

  • Full adaptation of modules to essential installations in student housing, such as high-speed internet, heating, and air conditioning systems.

  • Flexibility in adapting designs to specific campus needs and the possibility of easy expansion or reconfiguration in the future.

  • Reduction of construction time by 30-50% compared to traditional methods.

  • Fixed module production prices, eliminating the risk of unexpected expenses and ensuring greater predictability of construction costs.

Front image

Projects

  • Apartments in Grubbenvorst

    Project image

    Location:

    Grubbenvorst, Holandia

    Area:

    18 modules

    Floors:

    1 floor

    Material:

    Wood

    Scope:

    Production, transport, and installation of modules

    Client:

    Blauw Building Solutions

  • Offices in Cologne

    Project image

    Location:

    Cologne, Germany

    Area:

    1322 m2

    Floors:

    2 floors

    Material:

    Wood

    Scope:

    Production, transport, and installation of modules

    Client:

    KIP Fertigbau GmbH

  • Kindergarten in Warsaw

    Project image

    Location:

    Warsaw

    Area:

    2x 500 m2

    Floors:

    Ground Floor

    Material:

    Steel

    Scope:

    Production, transport, and installation of modules

    Client:

    City of Warsaw